200 TPH Frac Sand Plant,
Clayton, Iowa
Engineering Design and Management
The
200 tons-per-hour glass/frac sand mine and processing
plant is located on the bank of the Mississippi River in
Clayton Iowa. The turnkey project encompassed process
development, engineering design, construction plans, and
construction management. The plant will produce sand and
glass sand products utilizing primarily washing, sizing
and drying. This project is the second turnkey under
construction.
FEDINC provided detailed engineering design plans
and specifications suitable for procurement and
construction which included multi-disciplined
coordination of Civil, Structural, Mechanical,
Electrical, Piping, Process Flow Diagram (PFD), and
Piping and Instrumentation Design (P&ID) engineering.
FEDINC provided supervision, coordination and
administration of technical specialty engineering and
contractor teams dedicated to specific assignments.
Construction management included conceptual project
meetings with client, preparation and development of
conceptual drawings, preliminary engineering and cost
estimating, construction drawing packages,
specifications, bidding documents, and provision of
certified quality assurance (CQA) and final
certification of construction.
Specification preparation, vendor and subcontractor
solicitation, quotation evaluation, purchasing,
scheduling and expediting was also provided.
Construction related activities began in early March
2007 which included: preparation of construction
drawings, bid documents, contractor selection, provision
of construction management and construction quality
assurance services and construction certification.
 
|